• Pre-Installed Intelligent Box-Type Distribution Transformer Substation
  • Pre-Installed Intelligent Box-Type Distribution Transformer Substation
  • Pre-Installed Intelligent Box-Type Distribution Transformer Substation
  • Pre-Installed Intelligent Box-Type Distribution Transformer Substation
  • Pre-Installed Intelligent Box-Type Distribution Transformer Substation
  • Pre-Installed Intelligent Box-Type Distribution Transformer Substation

Pre-Installed Intelligent Box-Type Distribution Transformer Substation

Application: Power, Electronic, Rectifier
Phase: Three
Core: Core-type Transformer
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Pre-Installed Intelligent Box-Type Distribution Transformer Substation pictures & photos
Pre-Installed Intelligent Box-Type Distribution Transformer Substation
US $10,000 / Piece
Min. Order: 1 Piece

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
Box-type Substation
Cooling Method
Dry-type Transformer
Winding Type
Multi-winding Transformer
Certification
ISO9001-2000, ISO9001, CCC
Usage
Power Transformer, Distribution Transformer
Frequency Characteristics
Low Frequency
Shape of Core
Ring
Brand
Ceeg
Tapping Range
±2X2.5%
Vector Group
Dyn11, Yyn0
High Voltage
10(10.5, 11, 6.6, 6.3, 6)Kv
Low Voltage
0.4kv
Rated Capacity
500~2500kVA
Transport Package
Wooden Case / According Customers′ Demands
Trademark
CEEG
Origin
Jiangsu, China
HS Code
8504330000

Product Description

Pre-Installed Intelligent Box-Type Distribution Transformer Substation

\ BRIEF DESCRIPTION OF THE SUBSTATION \


PRE-INSTALLED INTELLIGENT BOX-TYPE SUBSTATION - The product adopts a frame structure, welded with steel or assembled from steel plates, the frame is covered with a special paint layer, with strong mechanical properties, weather resistance, corrosion resistance preassembled (box-type) substation as a whole structure, the box is separated into three relatively independent small rooms that are high-voltage room transformer room and low greenhouse room lighting are automatically opened and closed with the door of the preassembled (box-type) There is a heat insulation layer at the top of the substation to prevent condensation caused by the rapid change of temperature in the box in the high temperature and competition area. In order to make the temperature in the box stable, the low-voltage room of the transformer room is equipped with an automatic temperature control device.

THE STRUCTURE OF THE SUBSTATION - 

HIGH-VOLTAGE CHAMBER - E
quipped with a high-voltage ring network cabinet, which has a perfect "five-proof" function. The high-voltage switch can choose a sulfur hexaoxide load switch and vacuum circuit breaker. The cabinet has a variety of protection functions such as transformer short circuit and overload.
TRANSFORMER CHAMBER - Equipped with dry or oil-immersed transformers. The box is equipped with a perfect ventilation system, the temperature control value can be set according to needs, and the transformer is equipped with a live interval device to prevent accidental entry during observation.
LOW-VOLTAGE CHAMBER -  Divided into two assembly forms: with corridor type and without corridor type. The indoor can be equipped with metering cabinet, mainline inlet cabinet, outlet cabinet, capacitor cabinet, and contact cabinet (when two transformers are used), with the overall function of low-voltage switchgear. The general measuring cabinet and the main switch are integrated, that is, the upper part of the cabinet is the instrument, the measuring box, and the middle and lower parts are automatic air switches, arresters, and sensors. The capacitor cabinet can be automatically compensated by manual or automatic control. The capacitor reactive power compensation capacity is generally 15-30% of the transformer capacity.



\ FEATURES \

1. Composed of high-voltage switchgear, power transformers, and low-voltage switchgear, with a strong set of space, a small footprint, less investment, convenient installation and maintenance, and beautiful shape, highlighting the concept of green and environmental protection.
2. Built with  BIOSCO technology, it adopts a weld-free assembled structure, which also ensures a beautiful shape.
3. Good surface treatment, strong weather resistance, efficient all-natural ventilation structure.
4. Cabinet modularity design. The cabinet of the intelligent box-type substation adopts a modular design, it has a compact structure, is really safe and reliable to operate, and is easy to install. 


\ INTELLIGENT DISTRIBUTION SOLUTIONS \ 

Box substations are mainly composed of transformers, high-voltage switchgear, low-voltage distribution equipment, etc., an integrated distribution rooms, box-type transformers are widely used and mostly used in outdoor places, the operating environment is complex and often affected by high temperature, cold, and wind and sand, corrosion, etc., in the process of its operation and maintenance, there will be inconvenient inspection, slow fault response, long processing time, water ingress, fire, human intrusion and other problems. Intelligent box-type substations can be completed by pre-installation and retrofitting, which can greatly improve remote monitoring and fault handling capabilities, improve operational safety and equipment reliability compared with traditional box-type substations.


Pre-Installed Intelligent Box-Type Distribution Transformer Substation
Pre-Installed Intelligent Box-Type Distribution Transformer Substation
ZHONGHAN CONTROLLER MACHINE -


A smart energy management and control terminal deployed at the edge of the network, based on the equipment collects and process real-time and efficient real-time load, status and abnormal information, energy consumption data, etc. of the whole station, and flexibly access the cloud platform through a variety of network access methods.
 
ZHONGHAN INTELLIGENT ACQUISITION TERMINAL - 



Suitable for real-time monitoring and control of conventional power equipment/three-phase voltage current and power in medium and low voltage distribution systems, and can be used with current transformers to realize the comprehensive monitoring function of single/three-phase voltage, current and power, integrating measurement and communication functions, and has the functions of power quality monitoring, leakage current monitoring, fault recording and so on.
Pre-Installed Intelligent Box-Type Distribution Transformer Substation



\ CERTIFICATED & QUALIFIED \

The pre-installed intelligent box-type substations have conformed to GB12173-2008, GB1094.11-2007, GB/T10228-2015, JB/T3955-2016, GB4208-2017, and other national standards and industry standards and also won the ISO-9001, ISO-45001, and ISO-14001 certificates.
 
Pre-Installed Intelligent Box-Type Distribution Transformer Substation
Pre-Installed Intelligent Box-Type Distribution Transformer Substation
Pre-Installed Intelligent Box-Type Distribution Transformer Substation




\ CONDITION OF USE \

1. Ambient temperature +40°C~-25°C
2. altitude does not exceed 1000 meters
3. Relative humidity does not exceed 90% (+25°C), short-term up to 100% is allowed
4. Installation in places where there is no risk of fire, explosion, chemical corrosiveness, and severe vibration




\ DESIGN & MANUFACTURE PROCESS \

Based on more than 30 years of design, manufacturing, and experimental experience in the transformer industry, CEEG has developed a set of advanced three-dimensional + parametric design software, which can realize automatic design, cost optimization, and simulation.
Fully considering the requirements of the national and industrial standards, ensuring the advantageous design of products.

The high-voltage winding conductor is wound with a high-quality conductor and reinforced with long and short-cut glass fiber felt. Poured by the advanced Heidrich vacuum pouring system under vacuum. Effectively restrain the occurrence of partial discharge, and the partial discharge is ≤ 5pc.

The low-voltage winding adopts a high-quality foil conductor and is wound on an automatic foil winding machine. The foil winding machine adopts the patented technology of foil wire hydraulic energy-saving tension crimping device, high-precision detection of ±0.5mm, and advanced argon arc welding technology, which plays a key role in ensuring the quality of coil winding.

The iron core adopts a high-quality high magnetic conductivity-oriented silicon steel sheet, a 45° full oblique step lapping process, and the surface adopts special moisture-proof and rust-proof coating, which effectively reduces the no-load current and noise level.



\ TESTING \ 

All products strictly control the production process and quality links, and conduct strict tests and inspections according to national standards and customized requirements before leaving the factory, including partial discharge inspection, lightning resistance and electric shock inspection, noise inspection, and other necessary inspection items. Advanced test and detection equipment and a perfect inspection and detection system ensure the high quality and high quality of products.

Pre-Installed Intelligent Box-Type Distribution Transformer SubstationPre-Installed Intelligent Box-Type Distribution Transformer Substation

\ USE & INSTALLATION \

 SERVICE CONDITIONS - The installation site shall not be flooded by water, the altitude shall not exceed 1000m, and the ambient temperature shall not be higher than 40ºC. The relative humidity is 100%, and the environment is 40ºC to -25ºC (-25ºC requires an on-load tap changer and temperature controller).
The installation site shall be clean, free of conductive dust and corrosive gas, and have good ventilation or artificial ventilation conditions.
During product installation, it shall be 300mm away from walls and other obstacles, and there shall be a distance of 300mm between adjacent transformers. For distribution boxes and other places with limited installation space, the above distance can be adjusted appropriately.


PACKAGING & TRANSPORTATION - The products can be partially disassembled and transported (such as on-load tap changer, temperature controller, air cooling device, enclosure, etc. can be packaged separately) or packed as one piece in packaging boxes for transportation.
During the lifting process of the package, ropes shall be hung on sleepers at the four corners at the bottom of the package. Special lifting devices should be used to lift the products after the package is opened. It can be lifted 100mm - 150mm above the ground first, and then formally lifted after there is no abnormality.

During transportation, there shall be no upward and downward slope greater than 15° on the road. In order to ensure that the vehicle can bear the load evenly, the product center of gravity shall be located on the vertical centerline of the vehicle during loading. In order to prevent displacement and rollover during transportation, the long-axis direction of the product shall be consistent with the transportation direction, and the product shall be firmly bound on the vehicle.

VISUAL INSPECTION BEFORE INSTALLATION - After opening the package, remove the protective device and check the external conditions, especially paying attention to the mechanical integrity of the coil and iron core, and the bolt fastening at the connection.
After inspection, all fasteners, coils, and iron core pressing parts must be tightened in turn without any looseness.
Use dry compressed air or a clean cloth to clean the dust and dirt on the product.
When the storage time is long and there are water droplets or condensation on the transformer surface, it shall be dried until the insulation resistance of the coil is qualified.


INSPECTION BEFORE OPERATION - Measure the DC resistance of high voltage and low voltage windings. Then check the grounding of the iron core to see whether the grounding is reliable and whether foreign matters are overlapping. Last to test the insulation resistance.

ENERGIZING - Before putting into operation, the transformer shall be put into trial operation under no-load, and the protection system shall be checked and adjusted after 3 times of impulse closing.
When the product leaves the factory, the tap positions of voltage regulation at the high-voltage side are connected according to the rated position. Voltage adjustment is required during operation. The corresponding tap connection voltage is indicated on the nameplate (when there is no excitation voltage regulation), and it must be carried out when the transformer power supply is cut off.



Pre-Installed Intelligent Box-Type Distribution Transformer Substation

\ ABOUT CEEG \

3 INDUSTRIAL ZONES 
4 FACTORIES
15 OVERSEAS BRANCHES
80+ GLOBAL MARKETS

THIS IS OUR DEVELOPMENT -  Headquartered in Nanjing, CEEG has always been adhering to the core values of "foresight, innovation, and responsibility" since its establishment in 1990, focusing on production and manufacturing for more than 30 years. In years of development, CEEG has Integrated independent research and development, intelligent manufacturing, and smart marketing services.

OUR PRODUCT - O
ur technical team has continued to explore and innovate boldly, and has successfully developed nearly a hundred products including evaporative transformers, load centers, 35kV amorphous dry transformers, nuclear power transformers, slow harmonic transformers, high-temperature transformers; there are also outstanding players in market segments: traction transformers, variable current explosion-proof transformers, multiple Pulse wave phase shifting, wind power conversion, photovoltaic conversion, three-phase three-column amorphous conversion, intermediate test conversion, data center supercomputing mobile equipment, etc. Among them, the star products of the company are the green and energy-saving "amorphous alloy dry-type transformer", the technology-leading "epoxy cast dry-type transformer", and the safe and reliable "flameproof dry-type transformer for mine use and mobile substation". The technology applied to the production has won more than 70 patent technology qualification honors.


OUR PARTNERS - Our products have been safely operating in major coal groups such as Shenhua Group, Anhui Tongling Mining Group, Pingdingshan Coal Industry Group, Jincheng Coal Industry Group, and Kaolain Group. Many well-known companies such as China Mobile, China Telecom, Inner Mongolia First Machinery, Inner Mongolia Pingzhuang Energy, and Jialing Motor also have established good partnerships with us. We also established long-term strategic cooperative relations with excellent enterprises all over the world, and our business partners include many great companies such as DuPont, Siemens, Hitachi Metals, and ABB. Our power transformers have been sold to over 80 countries and regions and got high recognition from customers overseas.

Pre-Installed Intelligent Box-Type Distribution Transformer SubstationPre-Installed Intelligent Box-Type Distribution Transformer SubstationPre-Installed Intelligent Box-Type Distribution Transformer Substation

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Pre-Installed Intelligent Box-Type Distribution Transformer Substation pictures & photos
Pre-Installed Intelligent Box-Type Distribution Transformer Substation
US $10,000 / Piece
Min. Order: 1 Piece

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
312
Year of Establishment
2014-11-03